Early access
Get early access

Faster takeoff. Faster estimates. More bids.

Acota measures the drawings and prices the job in the same place. When the takeoff is done, the estimate is done.

Sheet A2.11, Level 1 Floor Slab Plan. A slab, four footings, ten column joints and a curb are measured on the drawing, and the estimate under it lists each with its price, totalling $84,421.56 at sample prices.

Three programs. One tool.

A markup app, a takeoff app and a spreadsheet, with re-typing between them. Acota is all three on one set of data, so nothing is typed twice.

The tools of three programs, a markup app, a takeoff app and a spreadsheet, lie in three piles, each busy on its own. They pour into one place: the Acota app, with its tools in two rings around it.

Every detail, linked for you.

Acota links every detail bubble and SEE note to the detail it points to. No hour of hand-linking before the takeoff starts.

  • Every sheet named from its title block.
  • Detail bubbles, SEE notes and keynotes, linked with nothing to set up.
  • Click a bubble and the detail opens, zoomed, on top of your sheet.
Sheet A2.01, Level 1 Floor Plan. Its detail bubbles light up as links one after another. The pointer then opens three of them in turn, each in a detail window over the plan: detail 2 on A5.10, exterior wall section at canopy opening; detail 1 on A6.22, enlarged plan of the storage and dressing rooms; and detail 5 on A8.10, exterior furring at concrete panel.

Every addendum, stacked. Changes clouded.

Acota lays every issue of a sheet over the last one, in colour, and clouds what changed as real markups.

  • Black where the issues agree, red where only the bid set has it, blue where only the addendum does.
  • A reprint that drifted lines up in one click.
  • Every change clouded and numbered, as a markup you keep.
Compare on sheet A2.01. The bid set in red and an addendum in blue sit slightly out of register. Line up slides the addendum onto the bid set, so the shared linework turns black and only the changes stay red or blue. Then three revision clouds draw themselves around the changes: a wall removed between two offices, a new storage room, and a new partition. The addendum here is an illustration.

The spec book, read for you.

Acota reads the bid documents for conditions like working hours, testing and site access, and shows each clause on its page.

  • 13 conditions found in this set, across 209 pages.
  • 62 conditions in the library. Switch on the ones you price.
  • Approve a clause and it becomes a line in Division 1 of your estimate.
The General Conditions Detection Center on the Building Project 729 bid set. The spec book scrolls to page 2, section 1.4, where the clause on restricted working hours is highlighted. The pointer approves it, and the line Restricted working hours appears under Division 1, General conditions, in the estimate.

Place the assembly. Measure once.

Pick slab on grade from your catalog and Acota sets up what there is to measure: concrete, edge forms, rebar, vapor barrier.

  • One trace: 4,567 SF of slab and 84.6 CY of concrete.
  • The assembly brings its activities to price: 27 for slab on grade, 12 already ticked.
  • Set the scale once, from a preset or a known dimension.
Sheet A2.11, Level 1 Floor Slab Plan. The pointer clicks + Assembly, picks Slab on grade from the catalog and places it. Four measurements appear in the takeoff panel with Concrete 4000 psi armed. The slab is traced once: concrete fills to 84.6 cubic yards and the vapor barrier to 4,567 square feet from the same outline. The edge form is then traced along the perimeter, 229.6 square feet.

Move the drawing. The price follows.

Every quantity goes into the estimate with your unit costs, labor and markups. Change the drawing and the number changes with it.

  • Move a slab edge 4'-0" and the total moves +$1,024.62, before you let go.
  • Overhead, markup, bond and insurance, applied in your order.
  • Click a priced line to see what was measured for it.
Sheet A2.11 with the measured slab and the estimate under it. The pointer grabs the slab's east edge and drags it four feet out; an orange dimension shows the move. While it drags, the slab goes from 4,567 to 4,681 square feet and the total from $45,888.69 to $46,913.31, a change of $1,024.62.

Acota bids faster.

Measure once.

One trace feeds the quantities that come from it: the area, the volume and the materials on top.

Nothing re-typed.

The takeoff and the estimate are the same data. No export, no copying numbers across.

Priced as you draw.

The total is on screen while you measure, not at the end of the week.

More bids out.

Hours come off every bid, and those hours go into the next one.

For the person whose name is on the bid.

Estimators

Open the set, take off the first sheet, and have a number the same day.

Project managers

See what an addendum changed before it changes the schedule.

Subcontractors

Bid your scope from the GC's set without buying three programs to do it.

Bid more jobs with the same team.

Bring your next bid set. Acota names the sheets and links the details for you, so day one is takeoff, not set-up.

FAQ

No. Acota works on the PDF sets you already get.

No. Sheets are named from their own title block text, and general conditions are found by rules you can see.

Yes. Your catalog is your price book; import it from CSV or Excel.

The estimate and takeoff as CSV, the plans with your takeoff as PDF, and the current set as one PDF.

Yes. Add editors and viewers per project. Viewer seats are free.

Up to 150 MB per file today. Split larger sets before you upload.